Praise for the new drain Thames Water have installed below the café – and other works done on the western side of the lake for new sewer pipes which hopefully will end the misconnections problems. We had a lot of help from Cllr Barry and the LBE staff who ensured no trees were damaged and there was no cost to LBE for the works Thames Water undertook. We have asked that Thames Water monitor the water quality from the new drain.